diff --git a/src/articles/RFPs.md b/src/articles/RFPs.md index 1764354721aa88e525ddd5bc2fd4bd7c4234c3cf..2c355c69c0974744485df1a80f963b0f60430926 100644 --- a/src/articles/RFPs.md +++ b/src/articles/RFPs.md @@ -1,6 +1,6 @@ --- title: "Can we do away with RFPs?" -subtitle: "" +subtitle: "Originally published on Upstream - https://upstream.force11.org/posts/can-we-do-away-with-rfps" author: Adam Hyde date: "2022-02-01" category: "thoughts" @@ -64,4 +64,4 @@ That feedback was very interesting and inspired this post. It would be great to Assuming this stimulates discussion, then I will post more on this topic. I want to talk about avoiding pre-loaded assumptions in RFPs and how they can exclude good solutions and approaches from the very beginning. -Copyright © 2022 Adam Hyde. Distributed under the terms of the Creative Commons Attribution 4.0 License. The authors adhere to the Upstream Code of Conduct. \ No newline at end of file +Copyright © 2022 Adam Hyde. Distributed under the terms of the Creative Commons Attribution 4.0 License. The authors adhere to the Upstream Code of Conduct.